article thumbnail

Job Order Contracting – Lean Construction History

Job Order Contracting

The History of Job Order Contracting. The United States Department of the Army is attributed with initially developing and deploying Job Order Contracting during the early 1980s. An initial process framework was put in place that would subsequently be improved to become what we now know as Job Order Contracting, JOC.

Contract 100
article thumbnail

What is a JOC Unit Price Book

Job Order Contracting

Within a Job Order Contract, JOC, each project/job order requires a detailed line item cost estimate (created by the contractor and reviewed by the owner). This is the factor(s) that was approved when the JOC contract was approved and typically ranges between 0.80 Note: Costs and line items are typically updated annually). via 4BT.US

Overhead 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting – JOC – Best Management Practices

Building Information Management

There are multiple case studies, white papers, and research documents. Bare costs do not include contractor’s overhead(s) and profit. Estimating JOC projects and/or bidding JOC contracts requires many of the same considerations as a non-JOC situation” Average size projects. Annual volume. Competition. Type of work.

article thumbnail

Construction Cost Estimating Software vs. Spreadsheets – State of the Nation 2012

Building Information Management

Construction estimating involves the estimating of material, labor, equipment, overhead/profit and contingencies. Growing numbers of cost estimators now have the need to work with multiple projects, multiple estimates, and multiple contracts (IDIQ, JOC, SABER…) simultaneously and securely.

article thumbnail

How to Select a JOC Unit Price Book

Building Information Management

How to Select a JOC Unit Price Book– WHITE PAPER. A Unit Price Book – UPB – is very important to the quality, integrity, productivity, and transparency of a Job Order Contract. Presentation of line items as bare costs or inclusive of overhead and profit. INTRODUCTION.

article thumbnail

How to Select a JOC Unit Price Book

Building Information Management

How to Select a JOC Unit Price Book– WHITE PAPER. A Unit Price Book – UPB – is very important to the quality, integrity, productivity, and transparency of a Job Order Contract. Presentation of line items as bare costs or inclusive of overhead and profit. INTRODUCTION.

article thumbnail

Contractors Are Renting Rather Than Buying More Equipment.

ENR Construction

White Papers. The recession prompted many contractors to thin their fleets in order to lower overhead and generate cash. Amid PPP Slowdown, India Turns To Cash Contracts. Information is provided on construction projects in following stages in each issue of ENR: Planning , Contracts/Bids/Proposals and Bid/Proposal Dates.