Remove CSI Remove Drawings Remove Foundation Remove Sewer
article thumbnail

Hard Construction Costs

Job Order Contracting

Additional categories include mechanical/HVAC, electrical, foundation, interior, etc. Site – All site work and underground, aerial, water systems, drains, fire, paving, grading, sewers, etc. This makes it extremely difficult to accurately understand and compare estimates.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat was produced as a “first edition” in 1978 by Construction Specifications Canada and Construction Specifications Institute (CSI). 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 01 82 13 Foundation Performance Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat was produced as a “first edition” in 1978 by Construction Specifications Canada and Construction Specifications Institute (CSI). 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 01 82 13 Foundation Performance Requirements.