Remove CSI Remove Drawings Remove Overhead Remove Sewer
article thumbnail

Hard Construction Costs

Job Order Contracting

Site – All site work and underground, aerial, water systems, drains, fire, paving, grading, sewers, etc. Landscape – Grass, lawns, trees, mulch, shrubs, fertilizer, and every other material included in the construction of the projects based on the architectural drawings. How to Estimate Hard Construction Costs.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat was produced as a “first edition” in 1978 by Construction Specifications Canada and Construction Specifications Institute (CSI). 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 02 21 16 Measured Drawings. Conditions.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat was produced as a “first edition” in 1978 by Construction Specifications Canada and Construction Specifications Institute (CSI). 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 02 21 16 Measured Drawings. Conditions.