Remove Debt Remove Design Remove Railroad Remove Roads
article thumbnail

COVER STORY: Shovel Ready Sites Are Growing From The Ground Up

Buisness Facilities Contributed Content

Obtaining the Shovel Ready designation better positions the city of Becker [a St. One of the header designs is 45 feet wide. In September, the program helped to make a new designation in Goshen’s Waterford Commons Business Park in Indianapolis. Geringhoff is a 130 year old company, based in Ahlen, Germany. Indiana Lt.

Site 49
article thumbnail

LOCATION FOCUS: California Dreamin’ – A Rebound Fueled By New Energy

Buisness Facilities Contributed Content

Last year, a State Budget Crisis Task Force headed by former Fed Chairman Paul Volcker estimated California’s long-term debt at a staggering $370 billion. that are LEED-certified (Leadership in Energy and Environmental Design). Barstow is where an eclectic mix of railroad, military, high technology, and mining employers have located.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Alabama Infrastructure Grant Program: Funds are available to public entities for extension of water, sewer and road facilities to service new or expanding industries. Alabama Industrial Access Road & Bridge Program: Provides financial assistance to communities for industrial access to new and expanding industries.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

ENTERPRISE ZONE CREDIT: To stimulate growth in depressed areas of the state, Alabama offers certain tax credit incentives to business that locate or expand within a designated enterprise zone. ALABAMA INFRASTRUCTURE GRANT PROGRAM: Funds are available for extension of water, sewer and road facilities. The program ends December 2016.

Income 75
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). design/negotiate/build). Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). design/negotiate/build). Requirements.