Remove Debt Remove Drawings Remove Schedule Remove Sewer
article thumbnail

Global AEC is limping, hobbling. It should be handed over to our children. Turn it back into a viable career choice and let them thrive and contribute to its recovery!

DebunkTheBIM

They’d carry on obligingly climbing the limited staircase of their careers by keeping their profiles low and sticking to forever designing cheap office layouts, calculate bending moments or size sewer pipes. The second group, a small minority would also say ‘no it is not’ but would not believe or live by this statement.

Roads 53
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. 00 01 20 List of Schedules. 00 31 13 Preliminary Schedules. Preliminary Project Schedule. Preliminary Construction Schedule. Measured Drawing Information. 00 43 73 Proposed Schedule of Values Form. 00 43 83 Proposed Construction Schedule Form. Requirements.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. 00 01 20 List of Schedules. 00 31 13 Preliminary Schedules. Preliminary Project Schedule. Preliminary Construction Schedule. Measured Drawing Information. 00 43 73 Proposed Schedule of Values Form. 00 43 83 Proposed Construction Schedule Form. Requirements.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

ALABAMA INFRASTRUCTURE GRANT PROGRAM: Funds are available for extension of water, sewer and road facilities. PROPERTY TAX REFORM: Business: Accelerated Depreciation schedules for prospective acquisitions of commercial personal property have also been improved. The program ends December 2016.

Income 75