Remove Design Remove Lien Remove Roads Remove Sewer
article thumbnail

Illinois Supreme Court to Review Burke Case

Construction Lawyer

In a two-to-one opinion, the majority ruled that the lien was invalid because there was no improvement to the land, while the dissent maintained that the engineering services fell squarely within the provisions of the statute and the lien was valid. Meyer , 341 Ill. Rinaker , 185 Ill. 3d (3 rd Dist.,

article thumbnail

Illinois Supreme Court to Review Burke Case

Construction Lawyer

In a two-to-one opinion, the majority ruled that the lien was invalid because there was no improvement to the land, while the dissent maintained that the engineering services fell squarely within the provisions of the statute and the lien was valid. Meyer , 341 Ill. Rinaker , 185 Ill. 3d (3 rd Dist.,

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Alabama Infrastructure Grant Program: Funds are available to public entities for extension of water, sewer and road facilities to service new or expanding industries. Alabama Industrial Access Road & Bridge Program: Provides financial assistance to communities for industrial access to new and expanding industries.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

ENTERPRISE ZONE CREDIT: To stimulate growth in depressed areas of the state, Alabama offers certain tax credit incentives to business that locate or expand within a designated enterprise zone. ALABAMA INFRASTRUCTURE GRANT PROGRAM: Funds are available for extension of water, sewer and road facilities.

Income 75
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). design/negotiate/build). Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). design/negotiate/build). Requirements.