Remove Design Remove Overhead Remove Sewer Remove Travel
article thumbnail

Food Processing: Generating Growth for Good Eats

Buisness Facilities Contributed Content

Food testing, processing and packaging facilities as well as transportation companies, packaging design, equipment, and specialized refrigerated storage are all located within the city. It is served by the New Castle municipal water and sewer utility. Awarded AAA credit rating from Standard and Poor’s for nine consecutive years.

Indiana 40
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Application: This standard applies to warehouse or large overhead rolling doors. Door, Manual, Overhead. This standard applies to manually operated overhead doors. Manhole, Sewer. Application: This standard applies to manholes which contain sanitary sewer lines or other related piping systems. Door, Power Operated.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). design/negotiate/build). 01 33 16 Design Data.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). design/negotiate/build). 01 33 16 Design Data.