Remove Document Remove Estimating Remove Foundation Remove Inspections
article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. General inspection: Usual inspection of representative parts of a structure.

article thumbnail

Cost effective FSRM Facilities Facilities Sustainment, Restoration, and Modernization

Job Order Contracting

As a result, FSRM cost estimates and the ability to validate constractor proposal have suffered. The use of generic cost estimating software or spreadsheets are not appropriate for JOC. Sustainment includes regularly scheduled adjustment and inspections, maintenance, and emergency response and service calls for minor repairs.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STRUCTURAL DEFECTS OF FOUNDATIONS AT CONSTRUCTION.

The Constructor

The problem areas, effects in foundation and defects in structure due to those causes are presented here. The problem areas, effects in foundation and defects in structure due to those causes are presented here. Insufficient width of foundation Settlement of foundation occurs due to insufficient distribution of load.

article thumbnail

SOLING UNDER FLOORS & FOUNDATIONS

The Constructor

Rubble Stone Soling: The rubble stone generally used are of best variety of black trap / granite / basalt or other variety of stone available locally. Tweet Loading GET LATEST TOPICS IN YOUR EMAIL- SUBSCRIBE NOW.

article thumbnail

Integrated Project Delivery Software and Support Services

Job Order Contracting

While fundamental LEAN elements serve as the foundation, solutions can be tailored to an organization’s individual requirements. Upload and share documents and make them available to your whole team – including PDF, Word and Excel files, images and videos. Common Data Environment.

Software 150
article thumbnail

SETTING OUT OF FOUNDATION TRENCHES

The Constructor

The following points should he observed while setting out trenches: (i) Profiles, nails, strings and lime are used for Setting out the foundation plan. (ii) 2) The axial lines (center lines) of the trenches are marked with the help of profiles, sighting rails, strings and pegs. (3)

article thumbnail

7 Contractor Tips for Dealing With Insurance Adjusters & Owners

Levelset

With new customers in difficult situations, laying the foundations for great relationships takes on great importance. These types of adjusters have a lot of estimates to create in a short time. Review the insurance estimate. You may be able to spot mistakes or omissions that you found on your own inspection.