Remove Drawings Remove Fabrication Remove Life Cycle Remove Overhead
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 01 33 23 Shop Drawings, Product Data, and Samples. 01 43 19 Fabricator Qualifications. 01 33 23 Shop Drawings, Product Data, and Samples. 01 43 19 Fabricator Qualifications.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 01 33 23 Shop Drawings, Product Data, and Samples. 01 43 19 Fabricator Qualifications. 01 33 23 Shop Drawings, Product Data, and Samples. 01 43 19 Fabricator Qualifications.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Individual task orders generally include drawings, detailed unit prices, and reference specifications. If off-site time and materials work is required, such as site fabrication, the Owner shall be so notified at the time of the issuance of the TO by the Contractor. The Owner reserves the right to inspect such off- site work at any.

article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

o O perating, Maintaining and Testing Life Safety. o Total Cost of Ownership (TCO) o Life-­?Cycle Cycle Assessment (LCA). Demonstrate knowledge and ability to repair all HVAC Systems (calibrate, change, fabricate, recover, replace and trouble shoot as required…). approve project payments/draws. o Contracting.