Remove Drawings Remove Lien Remove Railroad Remove Residential
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 61 16 Lien Bond Form. Affidavit of Release of Liens Form. 00 61 16 Lien Bond Form. Affidavit of Release of Liens Form. 02 21 16 Measured Drawings. 01 33 29.05

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 61 16 Lien Bond Form. Affidavit of Release of Liens Form. 00 61 16 Lien Bond Form. Affidavit of Release of Liens Form. 02 21 16 Measured Drawings. 01 33 29.05

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The private sector participant finances 50 percent of the project cost and takes a first lien on assets pledged as collateral. The SBA takes a second lien on assets and finances up to 40 percent of the project cost, up to $1 million in some cases. Borrowers inject 10 percent in the form of cash or equity in real estate.

Income 75