Remove Drawings Remove Lien Remove Railroad Remove Travel
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

Uses: equipment costs, building and facilities, rent and utilities, travel, contractual services, salaries, and benefits, other operating and non-operating costs. The private sector participant finances 50 percent of the project cost and takes a first lien on assets pledged as collateral. CONNECTICUT. EMPLOYEE TRAINING PROGRAMS.

Income 75
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 61 16 Lien Bond Form. Affidavit of Release of Liens Form. 00 61 16 Lien Bond Form. Affidavit of Release of Liens Form. 02 21 16 Measured Drawings. 01 33 29.05

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 61 16 Lien Bond Form. Affidavit of Release of Liens Form. 00 61 16 Lien Bond Form. Affidavit of Release of Liens Form. 02 21 16 Measured Drawings. 01 33 29.05