Remove Drawings Remove nemetschek Vectorworks Remove Schedule Remove Visualization
article thumbnail

BIM Objects, Data, and Information – More than a 3D Pretty Picture – Soooo Much More!

Building Information Management

Traditionally, a value that was represented on a drawing may not correctly corresponded with the value within the specification simply due to a ‘typo’ An example being where a ’60 minute fire door’ has been recorded on the drawing but has been recorded as ’90 minutes fire rating’ within the specification.

BIM 51