Remove Drawings Remove Railroad Remove Sewer Remove Subcontracting
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 01 15 List of Drawing Sheets. Measured Drawing Information. Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 01 15 List of Drawing Sheets. Measured Drawing Information. Requirements.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

ALABAMA INFRASTRUCTURE GRANT PROGRAM: Funds are available for extension of water, sewer and road facilities. This reserve fund enables the financial institution to make loans beyond its conventional risk threshold and is available to draw upon to recover losses on loans made under the program. BUSINESS TAX CREDITS.

Income 75