Remove Education Remove Equipment Remove Feasibility Remove Phoenix
article thumbnail

Behind the Build: Interview with Jon Turner, President and Principal Engineer, Phoenix Civil Engineering

Autodesk Construction Cloud

Here to talk more about this topic is Jon Turner , President and Principal Engineer at Phoenix Civil Engineering. Tell us a little bit about Phoenix Civil Engineering and what you specialize in. We also help some of our clients if they need assistance with pre-planning or a feasibility study of their projects.

Phoenix 52
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Industrial Revenue Bonds: May be used as long-term financing of up to 100% of a project for: Acquisition of land, buildings, site preparation and improvements; Construction of buildings; Acquisition and installation of furnishings, fixtures and equipment; Capitalizable soft costs (e.g., Pollution control equipment.

Income 108