Remove Electrical Remove Fabrication Remove Modeling Remove Subcontracting
article thumbnail

5 Types of Subcontractor Software Transforming the TradesĀ 

Autodesk Construction Cloud

Subcontracting is a time-honored tradition. However, project management tools diverge in that they focus on project progress, rather than progress along a sub process, like fabrication or installation. 5: Model-Centric Tools. This will help your productivity skyrocket, from the field to the fabrication shop. .

Software 105
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Electrical Resistivity Investigations Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Electrical Resistivity Investigations Information. Electrical Resistivity Investigations Information.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Electrical Resistivity Investigations Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Electrical Resistivity Investigations Information. Electrical Resistivity Investigations Information.

article thumbnail

Job Order Contracting ā€“ Best Practices Implementation

Building Information Management

Projects may be architectural (finishes) , electrical, mechanical and/or plumbing in nature. The electrical may consist of, but not be limited to, demolition and construction of building electrical systems and may include service and distribution, general lighting, communications, controls and instrumentation, and other systems.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Equipment or transmission lines used directly in producing or transmitting electrical power, but not including distribution. The income tax credits established are intended to promote investment in renewable energy production using low-emission and zero-emission electricity generation technologies.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

Funds may be provided for the construction and/or improvement of water lines & wastewater facilities, sewer lines, sewage treatment facilities, roadways, natural gas-line services, electric power services, railroad spurs, lighting, sidewalks and alternative power sources such as solar. The public utilities tax rate is 4.25

Income 75