Remove Engineering Remove Lien Remove Procurement Remove Subcontracting
article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

The procurement process for a JOC contractor begins with an Owner request for proposal (RFP) where the real property Owner identifies the type(s) of work for which it is requesting services. The Technical team (Facilities Management / Engineering) develops specifications and plans necessary for the procurement and implementation of the JOC.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

architectural and engineering, interest incurred during construction, etc.). To qualify, the research must be conducted within California and include basic or applied research of scientific inquiry, original investigation for the advancement of scientific or engineering knowledge or improved function of a business component.

Income 108
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

architectural and engineering, interest incurred during construction, etc.). To qualify, a taxpayer’s research must be conducted within California and include basic or applied research of scientific inquiry, original investigation for the advancement of scientific or engineering knowledge or improved function of a business component.

Income 75
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. Procurement Requirements and Contracting Requirements. 00 00 00 Procurement and Contracting. 00 20 00 Instructions for Procurement. 00 23 00 Procurement Definitions. Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. Procurement Requirements and Contracting Requirements. 00 00 00 Procurement and Contracting. 00 20 00 Instructions for Procurement. 00 23 00 Procurement Definitions. Requirements.