Remove Equipment Remove Negotiation Remove Railroad
article thumbnail

How to plan your warehouse layout

The Korte Company

Will the facility be equipped to store perishable goods requiring refrigeration? Easy access to transit is non-negotiable. Owners have more freedom with the orientation of infrastructure like piping, ducting, wiring and processing equipment inside the warehouse. Internal factors.

Plans 75
article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

Additionally, IBM will work closely with local professors at LSU to create coursework focused on technology, math and software development, and equip students to meet the growing demand for business services including advanced analytics, process innovation and application development. With its proximity to the center of the U.S.

Metro 110
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Industrial Revenue Bonds: May be used as long-term financing of up to 100% of a project for: Acquisition of land, buildings, site preparation and improvements; Construction of buildings; Acquisition and installation of furnishings, fixtures and equipment; Capitalizable soft costs (e.g., Pollution control equipment.

Income 108
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Process Equipment Subgroup: Divisions 40 – 49. design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 62 89 Construction Equipment Form.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

INDUSTRIAL REVENUE BONDS: May be used as long-term financing of up to 100 percent of a project for: Acquisition of land, buildings, site preparation and improvements; Construction of buildings; Acquisition and installation of furnishings, fixtures and equipment; Capitalizable soft costs (e.g., The program ends December 2016.

Income 75
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Process Equipment Subgroup: Divisions 40 – 49. design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 62 89 Construction Equipment Form.

article thumbnail

LOCATION FOCUS: Texas: Big Heart, Country, Business

Buisness Facilities Contributed Content

percent in 2011 with top exporting industries that included petroleum and coal products, chemicals, computer and electronic products, non-electrical machinery and transportation equipment. Rick Perry cuts the ribbon at the grand opening of the equipment giant's new hydraulic excavator manufacturing plant in Victoria, TX.

Texas 45