Remove Fabrication Remove Lien Remove Modeling Remove Subcontracting
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

The Contractor shall furnish as part of its overhead cost, included in the coefficient, all necessary protective equipment, concrete mixing boxes, water barrels, wheelbarrows, hoes, shovels, tools, mortar boards, ladders, portable scaffolding, shop tools, hand tools, shop equipment, and fabricating items customary to the trade, etc.,

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Energy Innovations Small Grant (EISG) Program: Provides up to $95,000 for hardware projects and $50,000 for modeling projects to small businesses, non-profits, individuals and academic institutions to conduct research that establishes the feasibility of new, innovative energy concepts. The State’s current loan guarantee can be up to $2.5

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The private sector participant finances 50 percent of the project cost and takes a first lien on assets pledged as collateral. The SBA takes a second lien on assets and finances up to 40 percent of the project cost, up to $1 million in some cases. Borrowers inject 10 percent in the form of cash or equity in real estate.

Income 75