Remove Fabrication Remove Lien Remove Overhead Remove Visualization
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 61 16 Lien Bond Form. Affidavit of Release of Liens Form. 00 61 16 Lien Bond Form. Affidavit of Release of Liens Form. 01 43 19 Fabricator Qualifications. 03 22 00 Fabric and Grid Reinforcing. 03 22 13 Galvanized Welded Wire Fabric Reinforcing. 03 22 16 Epoxy-Coated Welded Wire Fabric Reinforcing.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 61 16 Lien Bond Form. Affidavit of Release of Liens Form. 00 61 16 Lien Bond Form. Affidavit of Release of Liens Form. 01 43 19 Fabricator Qualifications. 03 22 00 Fabric and Grid Reinforcing. 03 22 13 Galvanized Welded Wire Fabric Reinforcing. 03 22 16 Epoxy-Coated Welded Wire Fabric Reinforcing.

article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

Demonstrate knowledge and ability to repair all HVAC Systems (calibrate, change, fabricate, recover, replace and trouble shoot as required…). o Determine costs/pricing structure (labor, materials, overhead, etc.). o Present information visually. Demonstrate knowledge and ability to optimize HVAC controls. Tra ining.