Remove Fabrication Remove Life Cycle Remove Massachusetts
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. 10:00 – 11:30 AM Construction – Fabrication Integration. in Civil Engineering, 1983, Massachusetts Institute of Technology, M. Steve Hunt , Dee Cramer. . Education: Ph.D.

BIM 45
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. 10:00 – 11:30 AM Construction – Fabrication Integration. in Civil Engineering, 1983, Massachusetts Institute of Technology, M. Steve Hunt , Dee Cramer. . Education: Ph.D.

BIM 40