Remove Fabrication Remove Negotiation Remove Railroad Remove Zoning
article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

1000 pound thrust; and Investments into new local capabilities including design, fabrication, and remote hot fire test capabilities for “Green” propulsion systems. Houston (Zone 84) and El Paso (Zone 68) also shined in BF’s new ranking of top Foreign Trade Zones. With its proximity to the center of the U.S.

Metro 110
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Enterprise Zone Credit or Exemption: The Alabama Enterprise Zone Act (Act. The program provides state and local tax incentives and non-tax incentives to businesses and industries located within Alabama’s Enterprise Zones. May not have closed or reduced employment elsewhere in Alabama in order to expand into an enterprise zone.

Income 108
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

ENTERPRISE ZONE CREDIT: To stimulate growth in depressed areas of the state, Alabama offers certain tax credit incentives to business that locate or expand within a designated enterprise zone. ENTERPRISE ZONES: Businesses located within the boundaries of an EZ are eligible for tax credits. LAMBRA zones are a companion to EZs.

Income 75
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 01 43 19 Fabricator Qualifications. 03 22 00 Fabric and Grid Reinforcing.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 01 43 19 Fabricator Qualifications. 03 22 00 Fabric and Grid Reinforcing.