Remove Foundation Remove Inspections Remove Materials Remove Procurement
article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. General inspection: Usual inspection of representative parts of a structure.

article thumbnail

STRUCTURAL DEFECTS OF FOUNDATIONS AT CONSTRUCTION.

The Constructor

The problem areas, effects in foundation and defects in structure due to those causes are presented here. The problem areas, effects in foundation and defects in structure due to those causes are presented here. There can be many causes for these defects.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

SOLING UNDER FLOORS & FOUNDATIONS

The Constructor

Preparation of Surface: The bed on which rubble soling is to be laid should be cleared of all loose materials, leveled, watered and compacted before laying rubble soling. Sun, 30 Sep 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates.

article thumbnail

SETTING OUT OF FOUNDATION TRENCHES

The Constructor

The following points should he observed while setting out trenches: (i) Profiles, nails, strings and lime are used for Setting out the foundation plan. (ii) Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates.

article thumbnail

MATERIALS FOR FORMWORK

The Constructor

Timber: This is the most common material used for bracing members to the form face. Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. It is easily cut to shape on site, and if handled and stored carefully, it can be used many times.

Materials 136
article thumbnail

PRE-CONCRETE CHECKS FOR FORMWORK & RELEASE AGENTS

The Constructor

Depending on how big or complicated the pour is, the inspection may just take few minutes or it could take hours. There are different release agents depending on what material is used for the formwork. Only when the formwork has been approved, may the pour take place.

Concrete 235
article thumbnail

HYBRID CONSTRUCTION TECHNIQUE AND STRUCTURAL.

The Constructor

The different materials are used according to their strengths and weaknesses to provide simple, buildable and competitive high-quality structures that offer consistent performance. Sun, 30 Sep 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates.

Concrete 214