Job Order Contract Execution Guide – Sample Template

Job Order Contracting

coefficient (reference table of allowable overhead). Architect/Engineer’s Guidelines, Quality Control, and other related documents in effect at. The UPB costs should NOT include contractor overhead and profit. The contractor typically bears overhead costs as part of the proposed coefficient of the JOC program.

Contract 100
article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Job Order Contracting GUIDELINES & PROCEDURES. Taxes, insurance, fringe benefits, and vacation allowances are to be included in the Contractor’s coefficient. Subcontracts. At the completion of the project, any savings associated with the Subcontract may be required to be passed along to the Order by way of a change order.