Remove Lien Remove Negotiation Remove Security Remove Visualization
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 43 13 Bid Security Form. design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 43 13 Bid Security Form. design/negotiate/build).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 43 13 Bid Security Form. design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 43 13 Bid Security Form. design/negotiate/build).

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

The Participating Lender sets all the terms and conditions of the loan (including premium levels, maturity dates, fixed or variable interest rates, secured or unsecured, amortization schedule, etc.) The Securities Industry and Financial Markets Association tracks the weekly average municipal interest rate from 2000 to current.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

FOREIGN TRADE ZONES (FTZs): Secured areas legally outside of U.S. The company’s obligation to repay the loan is secured by a direct-pay Letter of Credit from a bank rated ‘A’ or better. The private sector participant finances 50 percent of the project cost and takes a first lien on assets pledged as collateral.

Income 75
article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

Demonstrate ability to work with Security Personnel as required on:o Personnel ingress/egress. Demonstrate knowledge of ALL types of commissioning, and what is required in the Energy Independence and Security Act 2007 (EISA). Demonstrate the ability to work with Facilities team to negotiate rates and discounts. h ttp://www1.eere.energy.gov/femp/pdfs/omguide_complete.pdf).