article thumbnail

Validity of a Construction Cost Estimate – Public Sector

Job Order Contracting

In preparing a cost estimate, a value analysis must be performed concurrently to establish the appropriate selection, means, and methods of each tasks to ensure the lowest possible life-cycle cost per the approved detailed scope of work. utility, railroad) costs. Estimate includes all right-of-way and administrative costs.

article thumbnail

Behind the Build: Interview with Isabel Harlan, Sr. Engineer and Project Manager at Hatch LTK

Autodesk Construction Cloud

My last role with Dragados USA was as the Engineering Coordinator for the Long Island Railroad (LIRR) Third Track Expansion Project. I believe we need project teams to prioritize design interface coordination earlier on in a project’s life cycle so we have more bandwidth for innovative thought.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Federal Real Property Regulations (FAR / FMR)

Building Information Management

Landholding agency” means the Federal agency that has accountability for the property involved. For the purposes of this definition, accountability means that the Federal agency reports the real property on its financial statements and inventory records. The term includes, but is not limited to, runways, strips, taxiways, and parking aprons.

article thumbnail

Federal Real Property Regulations (FAR / FMR)

Building Information Management

Landholding agency” means the Federal agency that has accountability for the property involved. For the purposes of this definition, accountability means that the Federal agency reports the real property on its financial statements and inventory records. The term includes, but is not limited to, runways, strips, taxiways, and parking aprons.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

01 90 00 Life Cycle Activities. 34 78 23 Railroad Car Scales. Requirements. 01 88 13 Special Construction Performance Requirements. 01 88 16 Selective Construction Performance Requirements. 01 89 00 Site Construction Performance Requirements. 01 89 13 Site Preparation Performance Requirements. 01 91 00 Commissioning.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

01 90 00 Life Cycle Activities. 34 78 23 Railroad Car Scales. Requirements. 01 88 13 Special Construction Performance Requirements. 01 88 16 Selective Construction Performance Requirements. 01 89 00 Site Construction Performance Requirements. 01 89 13 Site Preparation Performance Requirements. 01 91 00 Commissioning.