Remove Negotiation Remove Overhead Remove Software Remove Visualization
article thumbnail

Every Owner Should Implement JOC – JOB ORDER CONTRACTING – for Renovation, Repair, Sustainabilty, and Maintenance Construction Projects

Building Information Management

Items that are not in the UPB can be negotiated, priced, and added to the UPB at any time. JOC technology – Running JOCs within a spreadsheet or generic construction cost estimating software is inefficient and provide inadequate reporting and management tools/capabilities. Greater Cost Visualization and Control.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 01 61 13 Software Licensing Requirements. 08 33 23 Overhead Coiling Doors.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 01 61 13 Software Licensing Requirements. 08 33 23 Overhead Coiling Doors.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

The contractor’s coefficient is based on cost elements such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. Interagency usage can serve to reduce the overhead associated with multiple acquisitions. These contracts have much of their pricing determined by pre-award competition.

article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

o Determine costs/pricing structure (labor, materials, overhead, etc.). Demonstrate the ability to work with Facilities team to negotiate rates and discounts. Demonstrate knowledge and ability to use Geographic Information System (GIS) and other Dept/Agency software programs in preparation of all required documents.