article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management. Consequently, the need for value management emerges. INTRODUCTION.

article thumbnail

Job Order Contracting Information

Job Order Contracting

To minimize the chance of favoritism or corruption, the sealed bid. Also referred to as the “Design-Bid-Build” process, this system has long been the most prevalent option for large and small public works contracts. Construction Cost Workbook – 2002 – Conference on the International Comparison Program World Bank.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Lean methodology is ignored by the construction sector

Job Order Contracting

These factors include… poor formal and professional education in the domain, low investment in research and development, deep rooted project culture, perceived long life-cycle of associated return on investment, resistance from construction projects’ participants and stakeholders, and lack of real property owner leadership and competency.

article thumbnail

LEAN Job Order Contracting Intro 4

Job Order Contracting

ASSET LIFE-CYCLE MODEL – Total Cost of Ownership Management – A framework for facilities life-cycle management. BIM, PROJECT DELIVERY METHODS, WASTE, & LACK OF LEADERSHIP – Traditional design-bid- build (DBB) contracting techniques, and even more recent attempts to improve DBB such as design-build (DB), CM@R, etc.

Contract 100
article thumbnail

Achieving Best Value for Facility Renovation, Repair, Maintenance, and Construction – 2016 and Beyond

Building Information Management

As one might anticipate lack of education, awareness, and capability, with respect to life cycle management of the built environment and/or total cost of ownership management, are the primary causal factors, as well as, resistance to change which is endemic to the sector as a whole. Design-bid-build. Proposals are reviewed.