Remove 2015 Remove BIM Remove Change Orders Remove Drawings
article thumbnail

#117:  Building Information Modeling

NH Construction Law

Over the past decade, Building Information Modeling (“BIM”) – computerized 3D portrayal of integrated building elements that allows a project or project subset to be built virtually before being built in the field – has become prolific in commercial construction. This is not your father’s CAD system.

article thumbnail

Manage Changes, Don’t Let Them Manage You

Autodesk Construction Cloud

Effective change management enables better coordination leading to less risk in design, and improved quality in construction. Change management with the Change Analysis tool. Teams can establish watch groups to closely monitor changes, configurable based on user criteria. How could this negative outcome have been avoided?

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting – 2015

Building Information Management

Reduced legal fees, and virtual elimination of change orders. Elimination of change orders. Facility owners do not have to provide a complete design, but rather rely on the JOC contractor to produce any essential drawings for the design. Integrated Order Contracting , pg.

article thumbnail

40 Under 40: Champions of Construction 2021

Autodesk Construction Cloud

Senior BIM Manager. Regarded as a pioneer of BIM technology at Amazon, Nima Jafari currently serves as the company’s Regional Senior BIM Manager, where he’s building the Emerging Technologies Department in Amazon TES from the ground up. Nima is no stranger to BIM. VDC/BIM Manager. Nima Jafari. Justin Maryak.