Remove 2015 Remove Certification Remove Drafting Remove Leases
article thumbnail

2018 IgCC is Not in Use Anywhere. A Detailed Analysis of Why?

Green Building Law Update

For purposes of this blog post highlighting the significant changes in the 2018 IgCC, that new code will be contrasted with the 2012 IgCC and not the 2015 version, which last version we are only aware a single jurisdiction has adopted. so there was room for wider adoption of a 2018 IgCC. Sec 901.4.1.4.

Green 156
article thumbnail

2018 IgCC – A Fast Paced Deep Dive

Green Building Law Update

For purposes of this blog post highlighting some of the significant changes in the 2018 IgCC, the new code will be contrasted with the 2012 IgCC and not the 2015 version (which later version we are only aware a single jurisdiction has adopted). So there is room for wider adoption of a 2018 IgCC. Sec 901.4.1.4.

Green 136
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Global Growth Surge in Southwest Louisiana

Business Facilities

Generally these sites are leased. The public will build to suit and issue bonds for buildings and lease them back to the business. Mary (PWSM) are shallow draft ports. The owners generally are open to the sale or lease of their property and some will consider build to suit options. Photo: Port of South Louisiana).

article thumbnail

LOCATION FOCUS: California Dreamin’ – A Rebound Fueled By New Energy

Buisness Facilities Contributed Content

The federal Bureau of Land Management, which has subsurface mineral rights for much of the Monterey shale field, in December sold about 15 leases for thousands of acres of potential shale development in California. It is anticipated that the Draft EIR will be brought before the Planning Commission for certification in March 2013.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

The principal and interest on the bonds are paid solely from the funds derived from leasing or selling the facilities to the user company. Effective for facilities placed into service between January 1, 2011 and December 31, 2015. Terms for both are normally 10-20 years and can finance up to 100% of the project costs.

Income 108