article thumbnail

Seven Finalist Cities Chosen For Smart City Challenge

Buisness Facilities Contributed Content

The finalists are: Austin, TX; Columbus, OH; Denver, CO; Kansas City, MO; Pittsburgh, PA; Portland, OR; and San Francisco, CA. When the challenge was issued in December 2015, USDOT’s launch partner, Paul G. USDOT developed the Smart City Challenge as a response to the trends identified in the Beyond Traffic draft report.

article thumbnail

Ports And FTZs: Enter With Less Risk

Business Facilities

BNA Vision will ensure the airport ascends alongside the city and ensure all travelers—whether for business or leisure—get the full Music City experience at Nashville International Airport. West Cameron Port is located on the Gulf of Mexico and provides deep water access, shallow draft capabilities and heavy infrastructure provisions.

Risk 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Industry Focus: Logistics – Going With The Flow

Buisness Facilities Contributed Content

Major metros such as Dallas, Kansas City, St. The Joplin Metro area’s position for serving national markets is nearly as advantageous as Chicago or Kansas City. The Joplin Metro area’s position for serving national markets is nearly as advantageous as Chicago or Kansas City.

article thumbnail

Leading the Home Building Industry: Pro Builder's 2021 Forty Under 40

Pro Builder

Accomplishments • Hired as an entry-level draftsman in 2015 and worked up the ranks to become project director. Off the Clock • Spending time with the Golden Girls (retrievers) Avery and Basil • Oklahoma State football and Kansas City Chiefs fan. . . . . Project Director, BIM Manager. TK Design & Associates.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Effective for facilities placed into service between January 1, 2011 and December 31, 2015. Program regulations are currently being drafted to include the expanded definition for “Advanced Manufacturers.” in 2015 0.0 The credit is claimed two years later, in 2013, 2014 and 2015, respectively. mils in 2013, 0.10

Income 108