Remove 2016 Remove Bidding Remove Change Orders Remove Modeling
article thumbnail

Why It’s Time for Contractors to Adopt Collaborative BIM

Viewpoint Construction Technology

Building Information Modeling (BIM) isn’t a new concept in construction. In the 2016 report, construction companies indicated they were planning to implement Virtual Design & Construction (VDC) teams. While 27 percent of companies reported having a BIM/VDC department, 28 percent said they don’t bid on BIM projects.

BIM 223
article thumbnail

Is a BIM Mandate Coming to the US?

Viewpoint Construction Technology

As we discussed in a recent blog post , the JBKnowledge 2017 Construction Technology report found that building information modeling (BIM) adoption in the United States has been fairly slow, with only 27 percent of construction companies having a BIM department. BIM Adoption Abroad. The United Kingdom is the gold standard for BIM.

BIM 230
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Improving Renovation, Repair, and Maintenance Project Delivery

Job Order Contracting

As a result of 1800+ tests, researchers have concluded that a primary cause in low project performance (time, cost and customer satisfaction) is the traditional owner-vendor relationship in which the owner uses a design, bid and build (DBB) approach. – 2016, Arizona State University – Job Order Contracting Performance Survey-2015.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 11 13 Advertisement for Bids. 00 11 16 Invitation to Bid. 00 24 13 Scopes of Bids. Scopes of Bids (Multiple Contracts). Scopes of Bids (Multiple-Prime Contract). 00 25 13 Pre-Bid Meetings. 00 41 00 Bid Forms. 00 41 13 Bid Form – Stipulated Sum (Single-Prime Contract). Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 11 13 Advertisement for Bids. 00 11 16 Invitation to Bid. 00 24 13 Scopes of Bids. Scopes of Bids (Multiple Contracts). Scopes of Bids (Multiple-Prime Contract). 00 25 13 Pre-Bid Meetings. 00 41 00 Bid Forms. 00 41 13 Bid Form – Stipulated Sum (Single-Prime Contract). Requirements.