Remove 2017 Remove Agreement Remove Commissioning Remove Leases
article thumbnail

2018 IgCC is Not in Use Anywhere. A Detailed Analysis of Why?

Green Building Law Update

But arising from a 2014 confidential agreement signed by the U.S. The remainder of the code is the substantive content that is the 2017 edition of ANSI/ASHRAE/ICC/USGBC Standard 189.1 Note, the 2017 edition of Standard 189.1 Note, the 2017 edition of Standard 189.1 Sec 1001.3.2 The 2015 IgCC (.

Green 156
article thumbnail

2018 IgCC – A Fast Paced Deep Dive

Green Building Law Update

Arising from the 2014 confidential agreement signed by ICC, ASHRAE, the American Institute of Architects, the IES, and the USGBC “to collaborate on the development of future versions of Standard 189.1, The remainder of the code is the substantive content that is the 2017 edition of ANSI/ASHRAE/ICC/USGBC Standard 189.1 Sec 1001.3.2

Green 136
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

North Dakota Incentives and Workforce Development Guide

Buisness Facilities Contributed Content

State Water Commission funds, not exceeding $20,000 per borrower, may be used to supplement Ag PACE funds for the purchase of irrigation equipment on new irrigated acreage. Loan funds may be used to finance real estate, machinery and equipment and for the purchase or leasing of equipment.

article thumbnail

FEATURE STORY: Racing To Be Ready – U.S. Ports Prepare for Post Panamax Era

Buisness Facilities Contributed Content

Under a public-private partnership (P3) agreement with Ports America Chesapeake, a 50-foot deep container berth was constructed in 2012. The cranes were also part of the agreement. Under the agreement, Ports America Chesapeake has daily operational control of Seagirt, but the state continues to own the facility.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

The principal and interest on the bonds are paid solely from the funds derived from leasing or selling the facilities to the user company. A business that applies for the exemption must enter into an agreement with the Governor of Alabama. Terms for both are normally 10-20 years and can finance up to 100% of the project costs.

Income 108
article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

be constructed at no net cost to the company’s customers and will help stabilize electric rates over the long term by providing a rate reduction totaling $10 million per year by 2017, commencing with a $3.3 The company estimates the line will be in service in 2017, with construction beginning next year in O’Brien County.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The principal and interest on the bonds are paid solely from the funds derived from leasing or selling the facilities to the user company. The increase is to occur in equal increments over a four year period, between 2014 and 2017. percent, between 2014 and 2017. percent down to 4.9

Income 75