Remove 2018 Remove Certification Remove Electrical Remove Leases
article thumbnail

Your ENERGY STAR Score is About to Fall Precipitously

Green Building Law Update

Building owners that utilize ENERGY STAR Portfolio Manager will see a dramatic change in the 1 to 100 ENERGY STAR scores after August 26, 2018. The release date for all updated scores is August 26, 2018. Based on the national average, the new national source electric factor will be slightly lower. You have 75 days to act.

article thumbnail

Fall Conference Circuit: 12 Top Takeaways

Stok

2: Net Zero Electricity does not equal Net Zero Energy. While we’re pouring immense effort into cleaning up the electricity grid and seeing impressive progress, there are other types of fuel that we need to be tackling with the same tenacity if we’re to truly achieve aggressive Net Zero Energy targets. 9: Rebuilding with intangibles.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

COVER STORY: Shovel Ready Sites Are Growing From The Ground Up

Buisness Facilities Contributed Content

are implementing site certification programs called “shovel ready”—meaning that the site is primed and ready for economic development. Additional construction will continue into 2016 and the plant is anticipated to begin commercial production in 2018. From the September/October 2013 issue . To get ready, many states across the U.S.

Site 49
article thumbnail

Top 10 Companies for Environmental Engineers to Work For

CivilJungle

” The Bureau of Labor Statistics projects 5.1 % employment growth for environmental engineers between 2018 and 2028. Our services include spare parts supply, and build-own-operate (BOO) and maintenance contracts, technical audits, leased water treatment systems, technical training, and remote monitoring. WAE Corp Pvt Ltd .

article thumbnail

Global Growth Surge in Southwest Louisiana

Business Facilities

Generally these sites are leased. The public will build to suit and issue bonds for buildings and lease them back to the business. The owners generally are open to the sale or lease of their property and some will consider build to suit options. Lastly, a runway resurfacing project is slated for the latter part of 2018.

article thumbnail

Advanced Manufacturing: Manufacturing Gets Smarter, Faster

Business Facilities

The plant began production of the all-new 2018 Camry in June. Ford in June announced it will invest $900 million into its Kentucky Truck Plant (KTP) in Louisville to support production of the 2018 aluminum-alloy bodied Lincoln Navigator and Ford Expedition. NPPD’s overall electric rates, based on final data from the U.S.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

The principal and interest on the bonds are paid solely from the funds derived from leasing or selling the facilities to the user company. If applying for a transferable credit certificate, no more than half the credit may be applied in a single calendar year. For 2018 and thereafter, the tax credit rates will be 20% of the first $2.5

Income 108