Remove Accounting Remove Compensation Remove Feasibility Remove Overhead
article thumbnail

Construction Estimating

Chianelli Estimating

Recently Contractors and Owners have found that Outsource Estimating is becoming a practical way to cut overhead. They do not have the burden of carrying costs like workmen’s compensation, general liability insurance, unemployment related costs, vacations or sick days, etc.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Competitive quotations shall be secured wherever feasible, and in all instances, when requested by the Owner. The Owner will be required to deliver such materials to the job site or compensate the Contractor for providing labor to deliver Owner-furnished materials to the job. Typically JOC coefficients range from 0.80

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

The contractor’s coefficient is based on cost elements such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. Interagency usage can serve to reduce the overhead associated with multiple acquisitions. These contracts have much of their pricing determined by pre-award competition.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Application: This standard applies to warehouse or large overhead rolling doors. Door, Manual, Overhead. This standard applies to manually operated overhead doors. When feasible the position of valves, air pressure, temperature, or water level being monitored should be altered to actuate the signals. Door, Power Operated.