article thumbnail

PSMJ Resources Blog: 8 Quality Control Tips Every PM Should Know

PSMJ Resources

Encourage those actually doing the work, not just principals, to stamp or seal documents. Have a final design review after all documents are prepared. Click here to order or contact PSMJ Education Department at education@psmj.com or (800) 537-7765. American Council of Engineering Companies (ACEC). Newer Post.

article thumbnail

PSMJ Resources Blog: 10 Elements of a Superior Proposal

PSMJ Resources

They are simple, short, and direct sales documents. Educate the prospect about his/her problem/issue. American Council of Engineering Companies (ACEC). Superior proposals demonstrate that your company has the best solution for the prospective client’s problem/program. They are personalized and customized. Open powerfully.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

PSMJ Resources Blog: When In Doubt, Fire Promptly!

PSMJ Resources

Get input from Human Resources on realistic decision criteria and necessary documentation. For more information, click here to download the program brochure or contact our Education Department at education@psmj.com or 617-965-0055. American Council of Engineering Companies (ACEC). PSMJ Resources, Inc. Newer Post.

article thumbnail

Specifications for design-build projects

Construction Specifier

Greater challenges arise when adapting DBB source documents for design-build. The contractor is required to build the project in complete compliance with the drawings, specifications, and other contract documents (Figure 1). At the time of this writing, most of DBIA’s 26 standard contract documents were published in 2010 and 2012.

EJCDC 52