Remove Aconex Remove Budget Remove Design Remove Engineering
article thumbnail

The Future Of Construction – BIM

Lets Build

Softwares like Aconex or Viewpoint can be used as the CDE. It’s the 4D (GenieBelt) which is related to time management and the 5D (Aconex) which is linked to the calculation of the budget. What is really important is the existence of a common file type (an IFC file for instance) that contains all the design information.

BIM 168
article thumbnail

The FM Mismanagement Problem Defined

Job Order Contracting

The FM mismanagement problem defined simply is the lack of leadership among real property owners and the associated lack of robust, programmatic processes across the AECOO sector (AECOO-Architecture, Engineering, Construction, Owner, Operator). Three Technology Trends Shaping the Future of Design and. Aconex Group. Xpera Group.

Aconex 189