Remove Aconex Remove CAD Remove Drawings Remove Software
article thumbnail

The Future Of Construction – BIM

Lets Build

CAD drawings are used during Level 0, but there is no sharing of the generated information models. Softwares like Aconex or Viewpoint can be used as the CDE. In a few words, BIM Level 1 is focusing on the transition from CAD to 2D and 3D pieces of information. The contractor is normally the one who manages a CDE.

BIM 168