Remove Agreement Remove BIM Remove Environment Remove Insurance
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. Efficient construction delivery methods (IPD – integrated project delivery, JOC – job order contracting), cloud computing, and BIM are all integral components. Friday: BIM Academic Education Symposium.

BIM 45
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. Efficient construction delivery methods (IPD – integrated project delivery, JOC – job order contracting), cloud computing, and BIM are all integral components. Friday: BIM Academic Education Symposium.

BIM 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Construction Risk Management: What to do when your project goes wrong

Lets Build

Risks Connected to the Natural Environment. Every country, or even city in some cases, has a different environment and its own natural phenomena. Read also here: The Future of Construction – BIM. Insurance is the most common method of risk relocation. Find Here: Construction Disputes: What You Need To Know.

Risk 165
article thumbnail

Navistar Makes U-Turn on Diesel Engines, Arrives at Cummins.

ENR Construction

Environment. Caterpillar Trucks In addition to its own product line, the move will impact Navistars supply deals, such as its agreement to produce vocational trucks for Peoria, Ill.-based Since Owners are Demanding Designers Carry Higher Insurance Limits, Is a Split-Limit Approach Best? ENR Subscriber Login ». -->. -->.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 00 Agreement Forms. 00 52 13 Agreement Form – Stipulated Sum (design/bid/build or. 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 23 Agreement Form – Construction Manager as Agent or Advisor – Stipulated. 00 52 00 Agreement Forms. Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 00 Agreement Forms. 00 52 13 Agreement Form – Stipulated Sum (design/bid/build or. 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 23 Agreement Form – Construction Manager as Agent or Advisor – Stipulated. 00 52 00 Agreement Forms. Requirements.