Remove Agreement Remove Commissioning Remove Drafting Remove Retail
article thumbnail

Nevada Stops Subsidizing Net Metering

Green Building Law Update

In the final days of 2015, Nevada became the front line in the looming nationwide fight over energy policy when the Public Utilities Commission of Nevada altered rates for net metering impacting homeowners with rooftop photovoltaic panels. But the retail rate is at an actual loss to the monopoly utility.

Nevada 120
article thumbnail

FEATURE STORY: Racing To Be Ready – U.S. Ports Prepare for Post Panamax Era

Buisness Facilities Contributed Content

Under a public-private partnership (P3) agreement with Ports America Chesapeake, a 50-foot deep container berth was constructed in 2012. The cranes were also part of the agreement. Under the agreement, Ports America Chesapeake has daily operational control of Seagirt, but the state continues to own the facility. Johns River.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

With 32 ports statewide, Louisiana offers six deep-draft ports capable of transferring large quantities of cargo, is one of only two U.S. In February, the company announced an agreement designating an Iowa-based manufacturer, Sabre Tubular Structures, as a preferred supplier of transmission structures for the project.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 00 Agreement Forms. 00 52 13 Agreement Form – Stipulated Sum (design/bid/build or. 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 23 Agreement Form – Construction Manager as Agent or Advisor – Stipulated. 00 52 00 Agreement Forms. Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 00 Agreement Forms. 00 52 13 Agreement Form – Stipulated Sum (design/bid/build or. 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 23 Agreement Form – Construction Manager as Agent or Advisor – Stipulated. 00 52 00 Agreement Forms. Requirements.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Appalachian Regional Commission and Delta Regional Authority Grants: Federal-state partnerships that work with the people of 37 Appalachian counties in Alabama and the Mississippi Delta region’s twenty Alabama counties to create opportunities for self-sustaining economic development and improved quality of life.

Income 108