Remove Agreement Remove Equipment Remove Negotiation Remove Railroad
article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

Additionally, IBM will work closely with local professors at LSU to create coursework focused on technology, math and software development, and equip students to meet the growing demand for business services including advanced analytics, process innovation and application development. With its proximity to the center of the U.S.

Metro 110
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Industrial Revenue Bonds: May be used as long-term financing of up to 100% of a project for: Acquisition of land, buildings, site preparation and improvements; Construction of buildings; Acquisition and installation of furnishings, fixtures and equipment; Capitalizable soft costs (e.g., Pollution control equipment.

Income 108
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

INDUSTRIAL REVENUE BONDS: May be used as long-term financing of up to 100 percent of a project for: Acquisition of land, buildings, site preparation and improvements; Construction of buildings; Acquisition and installation of furnishings, fixtures and equipment; Capitalizable soft costs (e.g., The program ends December 2016.

Income 75
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Process Equipment Subgroup: Divisions 40 – 49. 00 52 00 Agreement Forms. 00 52 13 Agreement Form – Stipulated Sum (design/bid/build or. design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Process Equipment Subgroup: Divisions 40 – 49. 00 52 00 Agreement Forms. 00 52 13 Agreement Form – Stipulated Sum (design/bid/build or. design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). Requirements.

article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

states with service to all six Class I railroads, and offers more than 7,300 miles of oil pipeline and 11,200 miles of gas pipeline. In February, the company announced an agreement designating an Iowa-based manufacturer, Sabre Tubular Structures, as a preferred supplier of transmission structures for the project.