Remove Airports Remove Architecture Remove Commissioning Remove Feasibility
article thumbnail

Behind the Build: Interview with Jon Turner, President and Principal Engineer, Phoenix Civil Engineering

Autodesk Construction Cloud

We see it in our roads, bridges, airports, and practically all public and private infrastructure projects. We also help some of our clients if they need assistance with pre-planning or a feasibility study of their projects. She and I sat in the room, and…I was like, ‘Wow, we’re actually going to build this thing.’

Phoenix 52
article thumbnail

BUSINESS REPORT: Texas – Innovation Moves Front And Center In Austin

Buisness Facilities Contributed Content

This a gem of a ballpark, already becoming the go-to place for year-round entertainment, embraces the three goals of the redevelopment: historic preservation of key buildings; continued aesthetic/architectural quality; and economic development that creates successful and vibrant community projects. In 2011, Perry signed Senate Bill (S.B.)

Austin 73
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

When office-to-residential conversion works

BD+C

Perkins Eastman received the Sinclaire commission after its developers toured WeWork: WeLive in nearby Crystal City, Va., The newly programmed rooftop at One City (right) gives residents an unobstructed view of City Hall, and the conversion of its uncovered high ceilings and architectural details are celebrated in the new lobby design (left).

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

architectural and engineering, interest incurred during construction, etc.). In 2001 the MRZ designation was renewed for the former Williams Air Force Base, now known as Williams Gateway Airport. Naval Air Facility in Goodyear, now known as Phoenix/Goodyear Airport, was designated as an MRZ. In December 2002, the former U.S.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

architectural and engineering, interest incurred during construction, etc.). Applicants must meet the same qualification criteria as Advantage Arkansas and must be approved by the Arkansas Economic Development Commission. Any unused credit may be carried forward for a period of nine years.

Income 75