Remove Airports Remove Design Remove Inspections Remove Schedule
article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. Carried out nor more than two years after last general or principal inspection.

article thumbnail

Achieving project success through product and material testing

Construction Specifier

By Heather Stahl-Figueroa Designing and constructing a building is increasingly complex. Begin with the basics The safety and integrity of any construction project, relies heavily on material testing and inspections. Material testing and site inspections are necessary throughout the process to ensure quality upon completion.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

ACCEPTANCE CRITERIA FOR DESIGN MIX CONCRETE

The Constructor

III Concrete which does not meet the strength requirements as specified in I, but has a strength greater than that required by II may, at the discretion of the designer, be accepted as being structurally adequate without further testing. times the standard deviation; and 2) 0.80 times the standard deviation; and 2) 0.80

Concrete 229
article thumbnail

TYPES OF CONCRETE MIX DESIGN

The Constructor

IS 456-2000 has designated the concrete mixes into a number of grades as M10, M15, M20, M25, M30, M35 and M40. In this designation the letter M refers to the mix and the number to the specified 28 day cube strength of mix in N/mm2. These mixes of fixed cement-aggregate ratio which ensures adequate strength are termed nominal mixes.

Concrete 240
article thumbnail

Free Interior Design Softwares

The Constructor

All of these elements are used by interior designers to develop a functional, safe, and aesthetically pleasing space for a building’s user. The work of an interior designer draws upon many disciplines including environmental psychology, architecture, product design, and traditional decoration (aesthetics and cosmetics).

Software 114
article thumbnail

Subways in America

The Constructor

Home News Videos Tips Building Building Bye Laws Building Materials Aggregates Cement Wood Building Tips Buildings Green Buildings Flooring Formwork/Shuttering Paints & Decoratives Skyscrappers Smart Materials Concrete Concrete Admixtures Concrete Cracks Crack Repair Concrete Durability Concrete Properties Concrete Types Fibre reinforced Fire Proof (..)

America 203
article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

In this phase you assemble your team and assign tasks to individuals, develop a budget for the project, develop a schedule and create a communications plan. It is kept in the mind that during the execution of the project, it is required to keep the process monitored for timely completion of the project, as per schedules.