article thumbnail

OSHA Alert: How to Prepare for an OSHA Inspection

FDR Safety

The most important step to take before an OSHA inspection even takes place is selecting a company representative. The company representative is the individual charged with representing the company’s interests during an OSHA inspection. Determining the type of inspection being conducted and the intended scope.

OSHA 156
article thumbnail

Typical JOC Process

Job Order Contracting

Regular Updates and Inspections. Final Inspection. Determine if design services are required. Determine project schedule and major milestones. Construction Performed. Warranty Period. Visit the jobsite and document conditions. Establish project goals. Define building systems and quality of materials.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

What to Look for in Construction Design Software

Lets Build

Construction design software is a necessity in today’s digital landscape, giving industry professionals an easier way to create blueprints and drawings of new designs. However, the construction design software market is overflowing with options—what works for one company might not be ideal for yours.

Software 148
article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. Carried out nor more than two years after last general or principal inspection. After a major incident.

article thumbnail

Effective Marketing For Diverse Construction Job Categories

Construction Marketing

Architects Design and plan construction projects, considering both aesthetic and functional aspects. Engineers (Civil, Structural, Mechanical, Electrical) Civil engineers focus on the design and maintenance of infrastructure. Structural engineers design and analyze structures for stability and safety.

article thumbnail

Inspection & Testing Method of concrete

Construction Cost Estimating

Concrete inspection and testing should be executed by experienced personnel to ensure that requirements of the specifications, methods and drawings are satisfied. This meeting will be conducted so that the subcontractor can narrate his/her plans for the concrete pour along with all the areas scheduled in this section of the procedure.

article thumbnail

Facilities Preventive Maintenance

Job Order Contracting

Manufacturer’s schedule for routine preventive maintenance, inspections, condition monitoring (predictive tests) and adjustments required to ensure proper and economical operation and to minimize repairs. Include recommended schedule for retesting and blank test forms. Installed model and features of each system.

Equipment 227