Remove Airports Remove Design Remove Project Management Remove Risk
article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

There are four phases of project management which are required to manage projects efficiently on quality, time and costs. Defining and organizing the project: Defining project is the first step in the project management process.

article thumbnail

Building Hong Kong's Airport

The Constructor

The two former islands that were levelled comprise about 25% of the surface area of the airport’s 12.55 Land reclamation for the airport added nearly 1% to the entirety of Hong Kong’s surface area. The project is the most expensive airport project ever, according to Guinness World Records.

Airports 203
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

WHAT IS PROJECT MANAGEMENT?

The Constructor

WHAT IS PROJECT MANAGEMENT? Tweet A project is a set of interrelated activities, usually involving a group of people working together toward a common goal or objective over a period of time. Not surprisingly, project management requires strong organizational, budgeting, staffing, controlling, and communication skills.

article thumbnail

Behind the Build: Interview with Isabel Harlan, Sr. Engineer and Project Manager at Hatch LTK

Autodesk Construction Cloud

For those working in infrastructure, there are always projects to address, like designing signals and traction power or performing maintenance. . Isabel Harlan , Senior Engineer and Project Manager at Hatch LTK , has learned to expect unexpected challenges in engineering. Engineer & Project Manager, Hatch LTK.

article thumbnail

ACCEPTANCE CRITERIA FOR DESIGN MIX CONCRETE

The Constructor

III Concrete which does not meet the strength requirements as specified in I, but has a strength greater than that required by II may, at the discretion of the designer, be accepted as being structurally adequate without further testing. times the standard deviation; and 2) 0.80 times the standard deviation; and 2) 0.80

Concrete 229
article thumbnail

TYPES OF CONCRETE MIX DESIGN

The Constructor

IS 456-2000 has designated the concrete mixes into a number of grades as M10, M15, M20, M25, M30, M35 and M40. In this designation the letter M refers to the mix and the number to the specified 28 day cube strength of mix in N/mm2. These mixes of fixed cement-aggregate ratio which ensures adequate strength are termed nominal mixes.

Concrete 240
article thumbnail

Free Interior Design Softwares

The Constructor

All of these elements are used by interior designers to develop a functional, safe, and aesthetically pleasing space for a building’s user. The work of an interior designer draws upon many disciplines including environmental psychology, architecture, product design, and traditional decoration (aesthetics and cosmetics).

Software 114