Remove Airports Remove Design Remove Project Management Remove Transportation
article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

There are four phases of project management which are required to manage projects efficiently on quality, time and costs. Defining and organizing the project: Defining project is the first step in the project management process. Tweet Loading GET LATEST TOPICS IN YOUR EMAIL- SUBSCRIBE NOW.

article thumbnail

WHAT IS PROJECT MANAGEMENT?

The Constructor

WHAT IS PROJECT MANAGEMENT? If you’re managing a project and you want to ensure its success, you need to transform what may begin as a vague concept into a measurable and accountable process that meets your company’s requirements. These achievements add predictability to your organization’s work.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

ACCEPTANCE CRITERIA FOR DESIGN MIX CONCRETE

The Constructor

III Concrete which does not meet the strength requirements as specified in I, but has a strength greater than that required by II may, at the discretion of the designer, be accepted as being structurally adequate without further testing. times the standard deviation; and 2) 0.80 times the standard deviation; and 2) 0.80

Concrete 229
article thumbnail

TYPES OF CONCRETE MIX DESIGN

The Constructor

IS 456-2000 has designated the concrete mixes into a number of grades as M10, M15, M20, M25, M30, M35 and M40. In this designation the letter M refers to the mix and the number to the specified 28 day cube strength of mix in N/mm2. These mixes of fixed cement-aggregate ratio which ensures adequate strength are termed nominal mixes.

Concrete 240
article thumbnail

Free Interior Design Softwares

The Constructor

All of these elements are used by interior designers to develop a functional, safe, and aesthetically pleasing space for a building’s user. The work of an interior designer draws upon many disciplines including environmental psychology, architecture, product design, and traditional decoration (aesthetics and cosmetics).

Software 114
article thumbnail

SEMERU Uses Fieldwire to Manage the Extension of Metro Line 14 in Paris

Fieldwire

Location: Paris, France with projects nationwide. Expertise: equipment of transport infrastructures, supervision systems, automation, security, video surveillance and sound systems. This ambitious project was a great opportunity but also a challenge for SEMERU. Yannick Pierre, Project Manager. Employees: 327.

Metro 52
article thumbnail

Digital Builder Ep 60: How Innovation and Technology Intersect

Autodesk Construction Cloud

This is especially true in transportation centers like airports, cruise ports, and terminals, where clear navigation and user-centric design are paramount. A well-designed environment not only enhances travelers' comfort but also ensures their safety as they navigate through complex routes and procedures. "I