Remove Airports Remove Documentation Remove Roads Remove Safety
article thumbnail

Safety Hazard on Construction Projects

The Constructor

This leads to the presentation of an Information Technology IT tool for construction project safety management Total-Safety and, in particular, a module within Total-Safety designed to help construction personnel develop method statements with improved levels of hazard identification.

Safety 114
article thumbnail

Subways in America

The Constructor

RECOMMENDED FOR YOU Building Hong Kong’s Airport Close Advertisement Hot Topics Recent Topics Most Viewed Most Discussed FOUR PHASES OF PROJECT MANAGEMENT WHAT IS PROJECT MANAGEMENT? All rights reserved.

America 203
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Oresund Bridge

The Constructor

It is the longest combined road and rail bridge in Europe and connects the two metropolitan areas of the Öresund Region: the Danish capital of Copenhagen and the Swedish city of Malmo. Advertisement Hot Topics Recent Topics Most Viewed Most Discussed FOUR PHASES OF PROJECT MANAGEMENT WHAT IS PROJECT MANAGEMENT?

Concrete 114
article thumbnail

CONSTRUCTION SITE PLANNING

The Constructor

The opportunities and constraints inherent to a site and the response to a program/design brief are analysed and documented in an overall site planning document that should accompany a development application. Good site planning therefore starts with a comprehensive analysis of the site, within the immediate and regional context.

Site 118
article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

The items that will need maintenance and or replacement include: Bearings Waterproofing membranes Road surfacing Movement joints Parapets The road surfacing will have to be replaced over long stretches of the carriageway. Tweet Loading GET LATEST TOPICS IN YOUR EMAIL- SUBSCRIBE NOW.

article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

Closing down the project: Once the execution of the project is completed, the project team evaluates the team’s performance, documents related to the project are achieved, lessons learned form the experiences in the project is captured and celebrate the project’s completion.

article thumbnail

RESIDENTIAL BUILDING SITE PLANNING

The Constructor

Residential house site should be located away from the busy commercial roads. Good foundation soil should be available at responsible depth. This aspect saves quite a bit in the cost of the building. Residential site should not be located near workshops, factories, because such locations are subjected to continuous noise.