Remove Airports Remove Drafting Remove Foundation Remove Negotiation
article thumbnail

LOCATION FOCUS: California Dreamin’ – A Rebound Fueled By New Energy

Buisness Facilities Contributed Content

Sacramento has a prime central location near the San Francisco Bay Area and key distribution channels via an international airport, deep-water channel seaport, and rail and interstate freeway systems. Currently, SMUD is building the foundation for the “smart grid.”

article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

With 32 ports statewide, Louisiana offers six deep-draft ports capable of transferring large quantities of cargo, is one of only two U.S. The foundation work for the Highland turbines started last fall and should be done by the end of the year, with the turbines and the more than 650 blades set to go up by the end of 2015.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Special Project Procedures for Airport Facilities. Foundation Commissioning.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

The allocation to each Public University which makes application shall be based on each Public University’s federally financed research and development expenditures as reported by the National Science Foundation. In 2001 the MRZ designation was renewed for the former Williams Air Force Base, now known as Williams Gateway Airport.

Income 108
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Special Project Procedures for Airport Facilities. Foundation Commissioning.