Remove Airports Remove Drafting Remove Negotiation Remove Regulation
article thumbnail

LOCATION FOCUS: California Dreamin’ – A Rebound Fueled By New Energy

Buisness Facilities Contributed Content

Jerry Brown fired the two state regulators who had overseen a 70 percent decline in state drilling permits since 2008, a notable turnaround for a state leader who in his first stint as governor in the 1970s pioneered many of California’s landmark environmental protection statutes. Last year, CA Gov.

article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

With 32 ports statewide, Louisiana offers six deep-draft ports capable of transferring large quantities of cargo, is one of only two U.S. The developer, Houston-based Clean Line Energy, is awaiting approval from regulators in Iowa and Illinois before going ahead with the direct current line. Already the nation’s No.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

To receive an abatement for property taxes, a project must meet certain qualifications and follow certain procedures, as determined by law and regulation. To receive abatement for any or all of these taxes, a project must meet certain qualifications and follow certain procedures, as determined by law and regulation.

Income 108
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Special Project Procedures for Airport Facilities. 23 51 13 Draft Control Devices.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Special Project Procedures for Airport Facilities. 23 51 13 Draft Control Devices.