article thumbnail

40 Under 40: Champions of Construction 2023

Autodesk Construction Cloud

It requires time and motivation to drive internal and external use cases at specific events or meetings. He doesn't hesitate to share his insights at industry events, and thanks to him, Hansen Yuncken has become a model for the successful adoption and utilization of construction technology.

article thumbnail

DBE: How To Grow Your Disadvantaged Business Enterprise The Smart Way

Help Everybody Everyday

Another problem is that DBEs often have to subcontract with larger firms. If all you’ve ever done is design bridges, you’ll be hard-pressed to get on a contract designing airport runways. In addition, make sure you attend any DBE outreach event that the agency might have. Once you find one, use them as much as possible.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Feature Story: 2016 Economic Development Awards

Buisness Facilities Contributed Content

Eleven different Pennsylvania-based construction companies already have been subcontracted to do much of the work, and many more opportunities will be made available as the project goes forward. will be the team’s lead designer and Walsh Infrastructure Management will provide bridge maintenance over the life of the 25-year contract.

Indiana 40
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

In 2001 the MRZ designation was renewed for the former Williams Air Force Base, now known as Williams Gateway Airport. Naval Air Facility in Goodyear, now known as Phoenix/Goodyear Airport, was designated as an MRZ. Currently there are two MRZs in Arizona. In December 2002, the former U.S.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

An ‘aviation development zone’ is any airport in Colorado that is a public-use facility designated by the FAA in its latest National Plan of Integrated Airport Systems, which has registered with the Colorado Office of Economic Development and International Trade (OEDIT).

Income 75
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).