Remove Airports Remove Fabrication Remove Foundation Remove Inspections
article thumbnail

MATERIALS FOR FORMWORK

The Constructor

Steel: Steel is also used in pre-fabricated formwork. Purpose made steel forms are fabricated when dimensional tolerances are critical, or when the forms are planned to be re-used. Aluminium: Often used in pre-fabricated formwork, that is put together on site. waffle floors).

Materials 136
article thumbnail

FORMWORK AND GOOD FORMWORK PROPERTIES

The Constructor

Its importance is evident when you consider that the cost of fabrication, erecting and striking the formwork, often exceeds the cost of the concrete it is designed to shape and support. Always inspect the formwork prior to pouring. GOOD FORMWORK: There are two factors that decide how well the concrete will look in the final result.

Concrete 223
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

COMMON STRUCTURAL FAILURE CAUSES

The Constructor

2) poor communication between the fabricators and erectors. (3) The most common causes of structural failures are: (1) Poor communication between the various design professionals involved, e.g. engineers involved in conceptual design and those involved in the supervision of execution of works. (2)

Concrete 177
article thumbnail

DEFLECTIONS IN DETERMINATE TRUSSES

The Constructor

The displacement can be computed as ……………. (1) In such cases, applying the principle of virtual work, ………………….2(a) 2(a) Where, = change in length of member k, = change in thermal expansion of member K = change in temperature.

Concrete 128
article thumbnail

CONCRETE CURING METHODS

The Constructor

Wet covers, such as straw, earth, burlap, cotton mats, and other moisture-retaining fabrics, are used extensively in curing concrete. I want to know the inspection before the concrete work of foundation. The disadvantages of this method are the expense involved and volume of water required. can u give me the answer?

Concrete 189
article thumbnail

POST TENSIONING IN REHABILITATION OF STRUCTURES

The Constructor

Reinforcement was fabricated and fixed along with post tensioned mono strands (encased in HDPE pipe) to profile. After fabricating and fixing shuttering in position, micro concrete encasement was carried out throughout the core holes in the slab. RECOMMENDED FOR YOU STRUCTURAL DEFECTS OF FOUNDATIONS AT CONSTRUCTION STAGE Close

Concrete 152
article thumbnail

FIXING OF PRECAST CLADDING

The Constructor

The metal should have good workability but also keep its strength during fabrication. The metal should normally be specified from standard widths and thickness. Non standard materials are difficult to purchase and also very expensive. Green part in the drawing represent restraint fixing and blue part as load bearing fixing.

Concrete 124